Missionary Baer Culverts
Owner: San Juan National Forest
Contract #: 50-82CS-2-0162
Contract Amount: $401,321.38
Allowed Completion Date: 08/02/03
Finished Date: 7/28/03
Completed on time and on budget
Description: Replaced small and large culverts on Missionary Ridge Road and small culverts on the Pine River Road.
Awarded: 9/18/02
Start Date: 10/14/02
Completion Date: 7/17/03
Florida River Bridge
Owner: San Juan National Forest
Contract #: 43-82CS-2-0063
Contract Amount: $90,424.89
Completed on time and on budget
Description: Removed existing road deck and superstructure. Repaired miscellaneous, minor deficiencies in pier and abutments. Installed glulam superstructure and decking. Paved bridge and approaches.
Awarded: 6/7/02
Start Date: 4/10/03
Completion Date: 5/10/03
Stoner Mesa Slide Repair
Owner: San Juan National Forest
Contract #: 50-82x9-0-127
Contract Amount: $157,684.90
Completed on time
Description: Repaired seven slides on mountain road consisting of, placement of rock buttress, mechanically stabilized tire-earth walls and reinforced fill.
Awarded: 9/20/00
Start Date: 5/22/01
Completion Date: 8/9/01
West Dolores Slide Repair
Owner: San Juan National Forest
Contract #: 920853
Contract Amount: $169,563.00
Completed on time and on budget
Description: Road realignment and stabilization
Awarded: 8/3/01
Start Date: 9/23/01
Completion Date: 11/20/01
Clear Creek Trailhead
Owner: San Juan National Forest
Contract Amount: $ 107,287.00
Completed on time and on budget
Description: Mass excavation, built trailheads and parking lot
Start Date: 7/25/01
Completion Date: 11/14/01
La Plata County Ball Field
Owner: La Plata County
Contract Amount: $214,554.41
General Contractor: FCI Constructors
Completed on time and on budget
Description: Installed new major league size baseball field, consisting of approximately 5323cy of excavation, screen and replace 5051cy of existing material, 5051 cy, and 2413cy import/place topsoil.
Start Date: 9/1/04
Completion Date: 12/31/04
Three Springs Development
Owner: GRVP
Contract Amount: $ 1,144,442.26
General Contractor: Triad Western
Completed on time and on budget
Description: Three Springs - Village I – Filing No. 1 Improvement Project. Supplied and installed KW Enterprises stone in multiple drop structures, inlet and outlet structures, and multiple rock walls.
Start Date: 8/26/04
Completion Date: Fall 2005
The Cliffs of Durango
Owner: Fondular
Contract Amount: $ 1,448,475.00
Project Superintendent: Daryl Crites
Completed on time and on budget
Description: Main road and driveway construction, utility trenching and backfill, and site improvements.
Start Date: 12/13/04
Completion Date: Spring 2007
La Plata County Airport
Owner: City of Durango
Contract #: AIP 3-08-0019-29
Contract Amount: $255,246.30
Project Engineer: Washington Group, Steve Doaks
General Contractor: Elam Construction, Marty Punchak
Completed on time and on budget
Description: Removed existing riprap in channel, and installed a new grouted riprap Channel with KW Enterprises stone.
Start Date: 4/13/05
Completion Date: 9/27/05
Fox Farm Subdivision
Owner: CDC
Contract Amount: $ 1,047,361.69
Owner Representative: Reid Ross
Completed on time
Description: Overlot grading, infrastructure, paved streets and sidewalks
Start Date: 3/01/06
Completion Date: 5/30/07
Three Springs Village 1 Filing 2
Owner: GRVP
Contract Amount: $ 1,676,367.00
General Contractor: SLV Earthmovers
Completed on time and on budget
Description: Rebuilt South Open Space drainage weir, and installed 36” reinforced concrete pipe.
Installed confluence drainage structures consisting of five drop structures and one overflow weir.
Supplied KW Enterprises stone for all structures.
Start Date: 8/20/06
Completion Date: 5/10/07
Three Springs Police Department
Owner: City of Durango
Contract Amount: $ 193,672.45
General Contractor: FCI Constructors
Completed on time and on budget
Description: Provided site work for new police substation
Start Date: 7/02/07
Completion Date: 11/27/07
BP America Operations Center
Owner: BP America
Contract Amount: $ 849,465.03
General Contractor: FCI Constructors
Completed on time and on budget
Description: Provided site work for new area operations center
Start Date: 8/02/07
Completion Date: 10/13/08
Cayton Campground Reconstruction
Owner: San Juan National Forest
Contract Amount: $ 658,895.55
Completed on time and on budget
Start Date : 11/02/07
Completion Date: Spring of 2009
Taylor Creek Slide Repair
Owner: San Juan National Forest
Contract Amount: $123,085.85
Completed on time and on budget
Description: Repaired slide on mountain road consisting of placement of rock buttress, mechanically stabilized tire-earth walls and reinforced fill.
Start Date: 5/12/08
Completion Date: 7/11/08
West Dolores Road Improvement
Owner: San Juan National Forest
Contract Amount: $67,550.00
Completed on time and on budget
Description: Hauled, placed, and compacted aggregate on a reconditioned roadbed on 2.2 miles of road between Black Mesa Road and Burro Bridge on West Dolores Road.
Start Date: 6/06/08
Completion Date: 6/25/08
Mill Creek Road Gabion Installation
Owner: San Juan National Forest
Contract Amount: $46,550.00
Completed on time and on budget
Description: Constructed three erosion control structures totaling 4050 square facial feet. Backfilled and reconditioned site.
Start Date: 6/09/08
Completion date: 7/03/08
Snowball/Nipple Mountain Roads Slide Repair
Owner: San Juan National Forest
Contract Amount: $43,800.00
Completed on time and on budget
Description: Roadway excavation, compaction, aggregate placement and grading.
Start Date: 7/03/08
Completion Date: 7/08/08
First Fork Road Slide Repair
Owner: San Juan National Forest
Contract Amount: $43,404.00
Completed on time and on budget
Description: Repaired slide on mountain road consisting of placement of rock buttress, mechanically stabilized tire-earth walls and reinforced fill.
Start Date: 7/07/08
Completion Date 7/16/08
Plumtaw Road Slide Repair
Owner: San Juan National Forest
Contract Amount: $99,238
Completed on time and on budget
Description: Repaired slide on mountain road consisting of placement of rock buttress, mechanically stabilized tire-earth walls and reinforced fill.
Start Date: 7/15/08
Completion Date 8/1/08Job History